TM 9-2350-261-20-2
REPLACE DIFFERENTIAL SWITCH LEAD — Continued
0319 00
INSTALLATION
1.
If removed, install clamp (2) on lead (5).
2.
Route lead (5) along differential and connect lead to power plant wiring harness (7) and switch (6).
3.
Place clamp (2) on clamp (4). Secure with screw (3) and new locknut (1).
FOLLOW-THROUGH STEPS
1.
Close power plant front access door and raise trim vane (see your -10).
END OF TASK
0319 00-2