TM 9-2350-261-20-2
ADJUST PIVOT STEER LINKAGE
0415 00
THIS WORK PACKAGE COVERS:
Adjustment (page 0415 00-1).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0780 00, Item 29)
Materials/Parts
FRH hydraulic fluid (WP 0782 00, Item 27)
Locknut (2)
Personnel Required
Unit Mechanic
References
WP 0120 00
Equipment Condition
Engine stopped/shutdown (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Driver’s seat removed (WP 0478 00)
ADJUSTMENT
1.
Remove two locknuts (1), screws (2), and rod end bearings (3) from two control handles (4). Discard locknuts.
2.
Push two control handles (4) forward to full release position.
3.
Move two master cylinder clevises (5) until contact with master cylinder internal piston is made.
041500-1