TM 9-2350-261-20-3
REPLACE PERSONNEL HEATER ASSEMBLY (ALL EXCEPT M1064) — Continued
0619 00
9.
Loosen two clamps (1). Remove heater (2) and shield (3) from carrier. Remove two clamps (4) and (5) from heater.
10. Remove four screws (6), three lockwashers (7), ground strap (8), four nuts (9), and two mounts (10) from power plant
bulkhead. Remove two clamps (1) from mounts. Discard lockwashers.
11. Remove four screws (11), lockwashers (12), and plenum (13) from heater (2). Discard lockwashers.
0619 00-4