TM-9-2350-261-34

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

  TM-9-2350-261-34 - Page 273 of 785

TM 9-2350-261-34
REPLACE FRONT MAIN WIRING HARNESS — Continued
0032 00
21. Install harness (12) on three cradles (13). Secure with three cradle clips (11).
22. Connect circuit 75A lead (8) and circuit 75B lead (9) to stop light switch (10) inside power plant compartment.
23. Connect circuit 452 lead (6) to front bilge pump (7).
0032 00-16


Back to Top