TM 9-2350-277-20-2
REPLACE FUEL CONTROL SHAFT AND LINKAGE — Continued
0217 00
INSTALLATION
1.
Install pin (4) on lever (18). Secure with washer (17) and new cotter pin (16).
2.
Install bearing (7) on shaft (8). Secure with washer (6) and new locknut (5).
3.
Position bearing (12) on bulkhead. Secure with washer (14), new lockwasher (15) and screw (13). Do not tighten
screw at this time.
4.
Install shaft (8) with bearing (7) on bearing (12). Secure bearing (7) to bulkhead with washer (10), new lockwasher
(11) and screw (9).
5.
Position bearing (12) for free movement of shaft (8) and tighten screw (13) on bearing (8).
6.
Install link (3) through pin (4) and secure with washer (2) and nut (1). Do not tighten nut at this time.
0217 00-4
Change 5