TM-9-2350-277-20-5

CARRIER M113A3, M577A3, M1059A3, M1064A3, M1068A3 AND M58

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL VOLUME 5 OF 6

  TM-9-2350-277-20-5 - Page 210 of 1047

TM 9--2350--277--20--5
REPLACE 5.0 KW AUXILIARY POWER UNIT BULKHEAD-TO HULL FUEL
SUPPLY HOSES (M577A3 AND M1068A3 ONLY)
0678 00
8.
Install strap (12) on fuel supply hose (13).
9.
Install elbow (10) in bulkhead and secure with jamnuts (9), and (11).
10. Install sleeve (14) and jamnuts (9), and (11) on fuel hose (7) and connect fuel hose to elbow (10).
11. Install nipple (3) in bulkhead crossbeam and secure with jamnut (4).
12. Inst a l l t wo ne w sl e e ve s (16), a nd (15) on fue l hose (1), a nd c onne c t fue l hose (1) t o e l bow (10) i n bul khe a d a nd t o ni ppl e (3)
in bulkhead crossbeam. Secure with jamnut (8).
13. Secure fuel hose (6) to personnel heater fuel hose (1) with two straps (5).
14. Connect fuel hose (2) to nipple (3).
FOLLOW--THROUGH STEPS
1. Open auxiliary power unit fue l shutoff valve (see your - 10)
2. Conne c t ba t t e ry ground l e a d (W P 0338 00).
3. St art a uxiliary power unit (se e your - 10). Check all fittings for l eaks. Turn auxiliary power unit off.
4. Inst all power plant rear access panel (WP 0439 00).
5. Inst a l l ri ght front fl oor pl a t e (W P 0539 00) or (W P 0544 00).
6. Inst a l l pe rsonne l he a t e r duc t (W P 0706 00).
7. Ra i se a nd l oc k ra m p (se e your - 10).
8. St op e ngi ne (se e your - 10).
0678 00--5/6 blank
Change 2
END OF TASK


Back to Top