TM-9-2350-311-10

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; OPERATOR’S MANUAL

NOVEMBER 1994

  TM-9-2350-311-10 - Page 509 of 775

TM 9-2350-311-10
3-7 FIRE CONTROL ALINEMENT TESTS AND MEASUREMENTS — CONTINUED
3-7.8
Testing and Scribing M15 Elevation Quadrant — Continued
b. Scribing
1
2
3
4
NOTE
Use a sharp instrument and cut two scribe lines on the M15 elevation quadrant. Use a straight
edge when possible to be sure the lines are even with each other.
Scribe one line (9) from the range quadrant mounting bracket pivot stud (10) to the front side of the M15
elevation quadrant (8).
Scribe the second line (11) from the cross-level knob (5) to the side of the M15 elevation quadrant (8).
Paint these scribe lines (9 and 11) with a paint that contrasts with the color of the M15 elevation
quadrant (8), so that they can be easily seen.
Wipe off the excess paint and let it dry.
3-105


Back to Top