TM 9-2350-311-20-1
11-15 SPADE
This task covers:
a. Removal
b.
Disassembly/Assembly
c. Installation
d.
Adjustment
INITIAL SETUP
Tools
Cotter pin (item 40,
General mechanic’s tool kit (item 64, Appx H)
Cotter pin (item 42,
Cotter pin (item 46,
Snap pins (2) (item
Appx G)
Appx G)
Appx G)
184, App G)
Bushing
Bushing
Bushing
(item 116, Appx G)
(item 117, Appx G)
personnel Required
(item 118, Appx G)
Three
a. Removal
Spade is heavy. At least three personnel are required to assist in lowering and
removing spade from hull to avoid serious injury.
1 Unlatch and lower spade assembly (1) to ground.
2 Remove two snap pins (2) and two spade pins (3). Discard snap pins.
3 Remove spade assembly (1).
11-55
WARNING