TM 9-2350-311-20-1
CONTINUED FROM STEP H
I
1. Place red lead of multimeter in socket A
(lead 2) and black lead to ground.
2. Turn MASTER switch ON and check for
voltage.
3. Turn MASTER switch OFF.
Is voltage present?
Repair or replace lead 2 of driver’s
bulkhead-to-master relay wiring
harness (para 8-46).
CONTINUED FROM STEP F
J
1. Place red lead of multimeter in socket A
(lead 14) and black lead to ground.
2. Turn MASTER switch ON, push STARTER
switch, and check for voltage.
3. Turn MASTER switch OFF.
Is voltage present?
I
Replace starter relay box (para 8-
31).
CONTINUED ON NEXT PAGE
3-45