TM 9-2350-311-20-1
CONTINUED FROM STEP D
1. Reconnect bulkhead-to-engine disconnect
2.
3.
4.
5.
bracket wiring harness to engine disconnect
bracket.
Disconnect lead 352A from aeration
detector.
Place jumper wire from lead 352A to
ground.
Turn MASTER switch ON and press
COOLANT indicator light.
Turn MASTER switch OFF.
Does COOLANT indicator light operate?
I
I
Repair or replace lead 352A of powerplant
wiring harness (para 8-43, M109A2/
M109A3; 8-44, M109A4/M109A5).
1
Replace aeration detector (para 8-16).
CONTINUED FROM STEP A
1. Reconnect lead 352A to COOLANT indicator
‘ 2.
3.
4.
5.
light.
Disconnect lead 27 from COOLANT
indicator light.
Place red lead of multimeter in lead 27 and
black lead to ground.
Turn MASTER switch ON and check for
voltage.
Turn MASTER switch OFF.
I
S
voltage present?
I
Replace COOLANT indicator light
(para 8-17).
CONTINUED ON NEXT PAGE
3-193