TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 410 of 1275

TM 9-2350-311-20-1
3-3 TROUBLESHOOTING CHART — CONTINUED
ab. BILGE PUMP CIRCUIT — CONTINUED
BILGE PUMP FAILS TO OPERATE — CONTINUED
CONTINUED FROM STEP H
2.
3.
4.
5.
Reconnect lead 450 to BILGE PUMP switch
input.
Disconnect lead 450 from circuit breaker
output.
Place red lead of multimeter in circuit breaker
output and black lead to ground.
Turn MASTER switch ON and check for
voltage.
Turn MASTER switch OFF.
Is voltage present?
Repair or replace lead 450 of driver’s
instrument panel wiring harness (para
1. Reconnect lead 450 to circuit breaker output.
2. Disconnect lead 10 from circuit breaker
input.
3. Place red lead of multimeter in lead 10 and
black lead to ground.
4. Turn MASTER switch ON and check for
voltage.
5. Turn MASTER switch OFF.
Is voltage present?
Replace circuit breaker (para 8-33,
M109A2/M109A3; 8-34, M109A4/
M109A5).
Troubleshoot master relay circuit (para
3-3b).
3-310


Back to Top