TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 405 of 1275

TM 9-2350-311 -20-1
BILGE PUMP FAILS TO OPERATE
Tools
General mechanic’s tool kit (item 64, Appx H)
Multimeter (item 36, Appx H)
TA-1 probe kit (item 43, Appx H)
Powerplant removed and special equipment installed
(para 4-5)
1. Disconnect lead 452 from bilge pump.
A
2 Place red lead of multimeter in lead 452 and
.
black lead to ground.
3. Turn MASTER switch ON and check for
voltage.
4. Turn MASTER switch OFF.
.
I
Is voltage present?
I
1
Replace bilge pump (para 11 -18).
CONTINUED ON NEXT PAGE
3-305
Personnel required
Tw o
Equipment Conditions


Back to Top