TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 398 of 1275

TM 9-2350-311-20-1
3-3 TROUBLESHOOTING CHART — CONTINUED
aa. PERSONNEL VENTILATION BLOWER CIRCUIT —
PERSONNEL VENTILATION BLOWER FAILS TO
CONTINUED
OPERATE — CONTINUED
CONTINUED FROM STEP C
D
1. Reconnect accessory control box-to-heater/
blower wiring harness to ventilation blower.
.
2. Disconnect accessory control box-to-heater/
blower wiring harness from accessory control
box.
3. Place a jumper wire from socket B (lead
159B) to ground.
4. Place red lead of multimeters in socket A (lead
159A) and black lead to ground.
5. Turn MASTER switch ON, VENTILATOR
BLOWER switch in EXHAUST position and
check for voltage.
6. Place VENTILATOR BLOWER switch in
INTAKE position and check for voltage.
7. Turn MASTER and VENTILATOR BLOWER
switches OFF.
Is voltage present?
Go to step G.
E
1. With connections and VENTILATOR
BLOWER switch in positions where voltage
was obtained in step D, move black lead of
multimeters to socket C (lead 159C).
2. Turn MASTER switch ON and check for
voltage.
3. Turn MASTER switch OFF.
Is voltage present?
CONTINUED ON NEXT PAGE
3-298


Back to Top