TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 396 of 1275

TM 9-2350-311-20-1
3-3 TROUBLESHOOTING CHART — CONTINUED
aa. PERSONNEL VENTILATION BLOWER CIRCUIT —
PERSONNEL VENTILATION BLOWER FAILS TO
CONTINUED
OPERATE
T
OO
I
S
General mechanic’s tool kit (item 64, Appx H)
Multimeters (item 36, Appx H)
TA-1 probe kit (item 43, Appx H)
A
1. Disconnect accessory control box-to-heater/
blower wiring harness from personnel
ventilation blower.
2. Place a jumper wire from socket B (lead
159A) to ground.
3. Place red lead of multimeters in socket A (lead
159C) and black lead to ground.
4. Turn MASTER switch ON, VENTILATOR
BLOWER switch in EXHAUST position
and check for voltage.
5. Place VENTILATOR BLOWER switch in
INTAKE position and check for voltage.
6. Turn MASTER and VENTILATOR
BLOWER INTAKE switches OFF.
Is voltage present in one position?
Go to step D.
CONTINUED ON NEXT PAGE
3-296


Back to Top