TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 397 of 1275

TM 9-2350-311-20-1
CONTINUED FROM STEP A
B
1. With connections and VENTILATOR
BLOWER switch in the position where
voltage was present in step A, move black
lead of multimeters to socket C (lead 159B).
2. Turn MASTER switch ON and check for
voltage.
3. Turn MASTER switch OFF.
Is voltage present?
Go to step D.
C
1. With multimeters disconnected and socket B
(lead 159A) grounded, place VENTILATOR
BLOWER switch in opposite position of
where voltage was obtained in steps A and B.
2. Place red lead of multimeters in socket C (lead
159B) and black lead in socket A (lead 159C).
3. Turn MASTER switch ON and check for
voltage.
4. Turn MASTER switch OFF.
Is voltage present?
Replace personnel ventilation blower
(para 11-24).
CONTINUED ON NEXT PAGE
3-297


Back to Top