TM 9-2350-311-20-1
CONTINUED FROM STEP A
B
1. With connections and VENTILATOR
BLOWER switch in the position where
voltage was present in step A, move black
lead of multimeters to socket C (lead 159B).
2. Turn MASTER switch ON and check for
voltage.
3. Turn MASTER switch OFF.
Is voltage present?
Go to step D.
C
1. With multimeters disconnected and socket B
(lead 159A) grounded, place VENTILATOR
BLOWER switch in opposite position of
where voltage was obtained in steps A and B.
2. Place red lead of multimeters in socket C (lead
159B) and black lead in socket A (lead 159C).
3. Turn MASTER switch ON and check for
voltage.
4. Turn MASTER switch OFF.
Is voltage present?
Replace personnel ventilation blower
(para 11-24).
CONTINUED ON NEXT PAGE
3-297