TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 448 of 1275

TM 9-2350-311 -20-1
3-3 TROUBLESHOOTING CHART —
CONTINUED
af. VENTILATED FACE PIECE SYSTEM CIRCUIT —
(4) CANNONEER NO. 2 NBC HEATER FAILS TO
CONTINUED
OPERATE; PURIFIER AND DRIVER’S NBC HEATER
OPERATE PROPERLY
INITIAL SETUP
Tools
General mechanic’s tool kit (item 64, Appx H)
Multimeter (item 36, Appx H)
TA-1 probe kit (item 43, Appx H)
A
1. Disconnect lead 439C from cannoneer no. 2
NBC heater.
2. Place red lead of multimeter in lead 439C and
black lead to ground.
3 Turn MASTER and NBC switches ON and
check for voltage.
4. Turn MASTER and NBC switches OFF.
Is voltage present?
I
I Repair or replace lead 439C of
ventilated face piece system power
wiring harness (para 8-62).
#
Replace cannoneer no. 2 NBC heater
(para 12-3).
END OF TASK
3-348


Back to Top