TM 9-2350-311 -20-1
3-3 TROUBLESHOOTING CHART —
CONTINUED
af. VENTILATED FACE PIECE SYSTEM CIRCUIT —
(4) CANNONEER NO. 2 NBC HEATER FAILS TO
CONTINUED
OPERATE; PURIFIER AND DRIVER’S NBC HEATER
OPERATE PROPERLY
INITIAL SETUP
Tools
General mechanic’s tool kit (item 64, Appx H)
Multimeter (item 36, Appx H)
TA-1 probe kit (item 43, Appx H)
A
1. Disconnect lead 439C from cannoneer no. 2
NBC heater.
2. Place red lead of multimeter in lead 439C and
black lead to ground.
3 Turn MASTER and NBC switches ON and
check for voltage.
4. Turn MASTER and NBC switches OFF.
Is voltage present?
I
I Repair or replace lead 439C of
ventilated face piece system power
wiring harness (para 8-62).
#
Replace cannoneer no. 2 NBC heater
(para 12-3).
END OF TASK
3-348