TM 9-2350-311-20-1
8-3 VOLTAGE REGULATOR
This task covers:
a. Removal
b. Installation
General mechanic’s tool kit (item 64, Appx H)
Lockwashers (4) (item 94, Appx G)
Lockwashers (4) (item 95, Appx G)
Batteries disconnected (para 8-28)
a. Removal
1
2
3
4
Disconnect wiring harness connectors (1 and 2) at voltage regulator (3).
Remove four screws (4), four flat washers (5), four lockwashers (6), and four nuts (7). Discard lockwashers.
Slide mount (8) forward far enough to gain access to voltage regulator
Remove four screws (9), four flat washers (10), four Iockwashers (11),
lockwashers.
NOTE
mounting screws (9).
and four nuts (12). Discard
Step 5 applies to M109A4/M109A5 Howitzers.
5 Remove strap (13).
6 Remove voltage regulator (3).
8-10