TM-9-2350-311-20-1

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR HULL, POWERPLANT, DRIVE CONTROLS, TRACKS, SUSPENSION, AND ASSOCIATED COMPONENTS

AUGUST 1994

  TM-9-2350-311-20-1 - Page 947 of 1275

10-12 ROAD WHEEL ARMS
This task covers:
a. Removal
b. Installation
INITIAL SETUP
T
OO
I
S
Personnel Required
General mechanic’s tool kit (item 64, Appx H)
Two
Socket wrench adapter (item 3, A
PPX
H)
Socket wrench set (item 56, A
PPX
H)
Torque multiplier (item 37, A
PPX
H)
Road wheel removed (para 10-10)
Torque wrench (item 71, A
PPX
H)
Shock absorber disconnected for road wheel arms 1 and
7 (para 10-19)
MateriaIs/Parts
Torsion bar removed (para 10-13)
Preformed packing (item 109, Appx G)
a. Removal
1 Remove eight screws (1).
WARNIN G
Road wheel arm assembly is heavy: over 100 lb (45.4 kg). Two personnel are
required to remove.
2 Lift off road wheel arm assembly (2) to remove.
3 Remove preformed packing (3) from road wheel arm assembly (2). Discard preformed packing.
b. Installation
WARNIN G
Road wheel arm assembly is heavy: over 100 lb (45.4 kg). Two personnel are
required to install.
1 Install new preformed packing (3) on road wheel arm assembly (2).
2
Install eight screws (1) on road wheel arm assembly (2). Torque screws to 160-200 Ib-ft (217–271 N·m).
10-30
TM 9-2350-311-20-1


Back to Top