TM 9–2350–311–20–2
Change 2
5–35
d.
Preparation for Service
1
Lace cable through muzzle brake (10) and secure to wrecker boom (8).
2
Slowly retract wrecker boom (8) to pull cannon tube (3) back into battery.
3
Secure the shaft collar (4) with spacer, install slotted nut (6) and new cotter pin (5) on recuperator piston
shouldered shaft (7). Remove spacer.
4
Remove fabricated bracket (9) and cable from wrecker boom (8).
5
Close the breech.
6
Adjust cap screw (18) to set damper assembly (19) to the correct length of 4 inches (10.16 cm).
18
19
4” (10.16 cm)
10
9
3
8
7
6
5
4
SPACER