TM 9–2350–311–20–2
19–30
19–6 ACCUMULATOR ASSEMBLY, SECONDARY — CONTINUED
b.
Service (Method Two)
WARNING
Be sure nitrogen cylinder contains only dry nitrogen. Certain other gases will cause nitrogen cylin-
der or secondary accumulator assembly to explode resulting in possible injury.
1
Remove two cap screws (1) and retaining strap (2).
2
Remove air valve cap (3) and loosen check valve nut (4) on valve (5) to release nitrogen precharge pres-
sure from secondary accumulator assembly (6).
3
Open and close nitrogen cylinder (9) shutoff valve (13) to clear shutoff valve seat of any dust or dirt.
4
Connect and tighten nitrogen charging assembly (7) to nitrogen cylinder (9), as shown. Repeat operation to
clear nitrogen charging assembly hose.
5
Connect air pressure gage assembly (16) to valve (5) on secondary accumulator assembly (6).
1
2
3
16
6
4
5
7