TM-9-2350-311-20-2

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR CAB, ARMAMENT, SIGHTING AND FIRE CONTROL, ELEVATING AND TRAVERSING SYSTEMS AND ASSOCIATED COMPONENTS

DECEMBER 1993

  TM-9-2350-311-20-2 - Page 732 of 828

TM 9–2350–311–20–2
19–24
19–5 ACCUMULATOR ASSEMBLY, PRIMARY — CONTINUED
b.
Service (Method Two)
WARNING
Be sure nitrogen cylinder contains only dry nitrogen. Certain other gases will cause nitrogen cylin-
der or accumulator to explode, resulting in possible injury.
1
Remove two cap screws (1) and retaining strap (2).
2
Remove air valve cap (3) and loosen check valve nut (4) on valve (5) to release nitrogen precharge pres-
sure from primary accumulator assembly (6).
3
Open and close nitrogen cylinder (9) shutoff valve (13) to clear shutoff valve seat of any dust or dirt.
4
Connect and tighten nitrogen charging assembly to nitrogen cylinder (9), as shown. Repeat operation to
clear nitrogen charging assembly (7) hose.
5
Connect air pressure gage assembly (16) to valve (5) on primary accumulator assembly (6).
1
2
3
16
4
5
7
6


Back to Top