TM 9-2350-311-34-1
65 Install two battery jumper leads (151) on battery terminals and tighten lugs (152, 153, and 154).
66 Place grommet (155) over front battery ground lead (1 56), slide grommet over lead, and position in slot on front
battery winterization box.
67 Install front battery ground lead (156) on battery B negative terminal and tighten lug.
68 Place grommet (157) on master relay lead (158) and install lead. Install battery connector lead (circuit 81)
(159) on battery A positive terminal and tighten lug.
69 Install rear battery ground lead (160) on battery D negative terminal and tighten lug.
10-19