10.
Install permanent splice/barrel of a terminal lug over ends of severed inner conductor.
11.
Insulate permanent splice from shielding with electrical tape.
12.
Strip other end of small insulated wire and splice into second ground sheath connector, ensuring contact is made
with shielding.
13.
Crimp second ground sheath connector.
14.
Slide insulation sleeve over entire spice.
15.
Heat insulation sleeve or tie both ends of flexible tubing.
16.
Record BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system using
standard maintenance procedures.
Option 3
Limitations:
RFI may be induced.
Personnel/Time Required:
•
1 soldier
•
0.5 hour
Materials/Tools:
•
Connector, splice, three required (item 10, Appendix C)
•
Crimping tool, terminal (found in M2/3 generic BDR kit, Section III, Appendix C)