TM-9-2350-358-BD

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A6

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT SUPPORT MAINTENANCE

MARCH 1994

  TM-9-2350-358-BD - Page 59 of 343

TM 9-2350-358-BD
3-12.
HEAVY DUTY CABLES, BROKEN - CONTINUED
Option 3
Limitations:
None
Personnel/Time Required:
1 soldier
0.4 hour
Materials/Tools:
Tape, insulation, electrical (item 63 Appendix C) or insulation sleeving, electrical (item 34, Appendix C)
Procedural Steps:
1.
Turn off MASTER power switch.
2.
Remove 2 inches of insulation from each end of broken wire.
3.
Split ends of cable into manageable strands.
4.
Join two ends by twisting corresponding strands together.
5.
Bend twisted end parallel to cable and insulate with tape.
6.
Record BDAR action taken.
When mission is complete, as soon as practical, repair the equipment/system using
standard maintenance procedures.
Option 4
Limitations:
None
Personnel/Time Required:
1 soldier
1.5 hour
Materials/Tools:
Tape, insulation, electrical (item 63, Appendix C)
3-14


Back to Top