*C2
*C2
*C2
PAR
195-196
INTERMEDIATE PLANETARY, LOW RING GEAR REBUIL D
CHAP
5,
SEC
XXV I
Figure 224. Removing spindle lock pin
and repair recommendations. Repair and re-
build points of measurement for fits, clear-
ances and wear limits are indicated by small,
lower case letters in fig. 376, fold-out 5 .
Refer to par. 239 for wear limits information.
196. ASSEMBLY (fig. 376, fold-out 5)
Note . Chill spindles 19 in dry ice
for approximately one hour, prior to
installation.
a .
Place intermediate-range planetary
carrier,
long-splined
end
down,
in
a
press
(fig. 226).
b . Grease the inside diameter of plane-
tary carrier pinion 22, fig. 376, fold-out 5.
c . Insert 22 spindle rollers 23 into the
pinion bore. Refer to fig. 215.
e . Insert alining tool 8351208 through the
pinion.
Figure 225. Removing intermediate-range planetary
carrier spindle
Figure 226. Installing intermediate-range planetary
carrier spindle
15 3