TM 9-2815-210-34-2-2
FRAME 3
1.
2.
3.
4.
5.
6.
7.
Turn on rheostat (1) until voltmeter (2) reads 24 volts.
Turn on adjustable valve (3) until pressure gage (4) reads 5 to 10 psi.
Check that nozzle and check valve assembly (5) inlet (6) and outlet (7) do not
leak. Get a new nozzle and check valve assembly if inlet or outlet leak.
Turn off adjustable valve (3).
Turn off rheostat (1).
Take off nozzle and check valve assembly (5).
Turn on adjustable valve (3) to bleed off pressure.
END OF TASK
4-544