TM 9-2815-210-34-2-2
FRAME 3
1.
Turn on rheostat (1) until voltmeter (2) reads 24 volts.
2.
Turn on adjustable valve (3) until pressure gage (4) reads 5 to 10 psi.
3.
Check that nozzle and check valve assembly (5) inlet (6) and outlet (7)
openings do not leak.
Get a new nozzle and check valve assembly if inlet
and outlet openings leak.
4.
Turn off adjustable valve (3).
5.
Turn off rheostat (1).
6.
Take off nozzle and check valve assembly (5).
END OF TASK
4-567