TM 9-2815-225-34&P
0048 00
0048 00-10
BIG CAM III ENGINE INSTALLATION (Contd)
23.
Install engine electrical harness transformer/rectifier negative lead (16) on alternator
transformer/rectifier negative terminal (14) with alternator terminal washer (7) and nut (6).
24.
Install engine electrical harness transformer/rectifier positive lead (8) on alternator
transformer/rectifier positive terminal (15) with alternator terminal washer (5) and nut (4).
25.
Install engine electrical harness negative lead (3) on alternator negative terminal (10) with
alternator terminal washer (2) and nut (1).
26.
Install engine electrical harness positive lead (9) on alternator positive terminal (11) with
alternator terminal washer (12) and nut (13).
27.
Install two drive belts (21) on alternator (22), drive pulley (25), and crankshaft pulley (26).
28.
Tighten jamnut (17) on adjusting rod (24) until tension on drivebelts (21) is 110 lbs (50 kg).
29.
Tighten jamnut (23).
30.
Tighten two alternator mounting bracket nuts (20) (hidden) and screws (19).
Figure 13. Alternator Electrical Connections Installation.
1
2
3
4
5
6
9
10
7
11
12
13
14
15
16
8