TM 9-2815-225-34&P
0048 00
0048 00-6
BIG CAM III ENGINE INSTALLATION (Contd)
13.
Connect fuel pump pressure sensor electrical connector (6) to fuel pump pressure sensor (5).
14.
Install fuel solenoid electrical harness lead (4) on fuel solenoid (1) with fuel solenoid terminal
lockwasher (2) and nut (3).
15.
Install A/C electrical harness ground lead (16) and ground jumber cable (17) on engine (19) with
two new A/C electrical harness ground lead starwashers (15), and screw (18).
16.
Install battery ground cable (27), starter electrical harness lead no. 83 (26) and ground jumber
cable (17) on starter ground terminal (25) with new starter ground terminal lockwasher (8) and
nut (7).
17.
Install battery positive cable (10) and three starter electrical harness leads no. 202 (12), no. 82
(13), and no. 421 (14) on starter positive terminal (24) with new starter positive terminal
lockwasher (11) and nut (9).
18.
Install starter electrical harness lead no. 74 (22) on starter S-terminal (23) with starter S-terminal
lockwasher (20) and nut (21).
Figure 9. Fuel Solenoid and Pressure Sensor Wiring Installation.
1
2
3
4
5
6