TM 9-2815-225-34&P
0048 00
0048 00-14
BIG CAM III ENGINE INSTALLATION (Contd)
43.
Install tachometer cable (2) on fuel pump tachometer drive (1).
44.
Install accelerator rod (16) on lower throttle lever (17) with accelerator rod screw (18), new locknut
(20), and two accelerator return springs (19).
45.
Align locating mark on transmission modulator cable clamp (5) to locating mark on mounting
bracket (10).
46.
Install transmission modulator cable (11) on mounting bracket (10) with transmission modulator
cable clamp (5), two screws (6), four washers (9), and two new locknuts (14).
47.
Install transmission modulator cable (11) on throttle lever (15) with retaining pin (3).
48.
Install fuel supply line (12) on fuel filter fitting (13).
49.
Install fuel return line (8) to fuel return line T-fitting (7) on engine (4).
50.
Install power steering hose (21) on elbow (25) of power steering reservoir (23).
51.
Install two power steering hoses (21) and clamps (22) on power steering reservoir (23) and power
steering pump (26). Tighten clamps (22).
52.
Install drain plug (24) in power steering reservoir (23).
53.
Install cooling fan (30) on cooling fan clutch studs (31) with six new cooling fan lockwashers (28),
washers (29), and nuts (27).
Figure 26. Throttle Lever Installation.
~
19
18
20
17
16
15
14
9
13
12
1
2
3
4
7
6
5
8
9
10
11