TM-9-2815-225-34-P

ENGINE, DIESEL: 6 CYLINDER IN-LINE TURBOCHARGED, CUMMINS MODEL NTC-400

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2005

  TM-9-2815-225-34-P - Page 456 of 736

TM 9-2815-225-34&P
0048 00
0048 00-22
BIG CAM III ENGINE INSTALLATION (Contd)
72.
Install upper radiator hose (9) and two upper radiator hose clamps (7) on thermostat housing
elbow (8) and radiator inlet tube (1). Tighten upper radiator hose clamps (7).
73.
Install cooling outlet tube (16) and three clamps (11) on water pump (17). Tighten clamps (11).
74.
Secure cooling tube outlet on support bracket (12) with cooling tube outlet screw (14) and nut (13).
75.
Install lower radiator hose (15) and two lower radiator hose clamps (10) on radiator (2). Tighten
clamps (10).
76.
Install bypass hose (6) and clamp (5) on radiator (2). Tighten clamp (5).
77.
Install two vent hoses (4) and clamps (3) on radiator (2). Tighten clamps (3).
78.
Install heater hose (23) and clamp (22) on heater hose tube adapter (21). Tighten clamp (22).
79.
Install heater hose (18) and clamp (19) on heater hose tube (20). Tighten clamp (19).
80.
Install exhaust S-pipe (28) and clamp (24) on exhaust pipe (30) with two exhaust pipe screws (25)
and nuts (29).
81.
Install exhaust S-pipe (28) and clamp (26) on turbocharger outlet flange (27). Tighten clamp (26).
Figure 36. Upper Radiator Hose Installation.
Figure 37. Lower Radiator Hose Installation.
~
~
1
2
3
7
8
9
10
11
10
15
16
12
14
13
4
6
5


Back to Top