TM-9-3990-260-14-P

CONTAINER ROLL-IN/OUT PLATFORM (CROP) MODEL M3 AND MODEL M3A1

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JULY 2001

  TM-9-3990-260-14-P - Page 45 of 306

TM 9-3990-260-14&P
Change 1
2-9
Table 2-1. Operators Preventive Maintenance Checks and Services - Continued
Item
No.
Interval
Location
Item to
Check/Service
Procedure
Not Fully Mission
Capable If:
10
After
Stowage Boxes
Ensure doors (25) or fasteners (26) are
not damaged.
Door cannot be closed.
11
After
Tiedown Rings
and Multipurpose
Provision Rings
Ensure all multipurpose provision rings
(27), tiedown rings (28), and tiedown
ring cross bars (29) are serviceable and
not damaged or distorted to the point that
they can no longer be used for their
primary purpose.
If more than four tiedown
rings or cross bars on the
same side are non-
operational or if one
multipurpose provision
ring is non-operational.
12
After
Deck
a.
Ensure deck is not ripped or torn.
a.
Deck is ripped or torn
so road is visible
through the damage.
b.
Ensure rivets are not missing.
b.
Two or more
consecutive rivets or
more than 10 rivets total
are missing.


Back to Top