TM-9-6920-430-14

COOLANT RECHARGING UNIT, TRAINING GUIDED MISSILE SYSTEM M80 AND CHARGER, BATTERY PP-7309/T

TECHNICAL MANUAL; OPERATOR’S AND ORGANIZATIONAL DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

AUGUST 1980

  TM-9-6920-430-14 - Page 46 of 180

TM 9-6920-430-14
(5) Open the safety cover (32). Unhook the two latches (33) and remove the
trainer from the cradles.
NOTE
If you want to refill more trainer bottles, perform all the steps in para. 2-3,
page 2-13, steps (5) through (10) in para. 2-4a, and all the steps in
para. 2-4b.
c.
Operational Standby
NOTE
System may be left in the operational standby mode during interim
operation.
(1) Close the argon gas supply valve (34) fully clockwise.
(2) Close INLET SHUTOFF valve (35.1) fully clockwise.
(3) Slowly open the INLET BLEED valve (35) one turn counterclockwise to
relieve high pressure in the hose. Close the INLET BLEED valve (35) fully clockwise as
soon as gas has vented.
2-20
Change 3


Back to Top