TM-9-6920-430-14

COOLANT RECHARGING UNIT, TRAINING GUIDED MISSILE SYSTEM M80 AND CHARGER, BATTERY PP-7309/T

TECHNICAL MANUAL; OPERATOR’S AND ORGANIZATIONAL DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

AUGUST 1980

  TM-9-6920-430-14 - Page 82 of 180

TM 9-6920-430-14
(6) Locate the proof pressure test equipment storage box and open the lid. The storage box
contains two flexible hoses (18), 100 feet of cable with attached control box (19), Pressure
Transducer Assembly (20), a cross fitting (21), embossing machine, and embossing tape. Remove the
cross fitting (21) from the storage box.
3-22
Change 1


Back to Top