PS Magazine - AUGUST 1983

PS, The Preventative Maintenance Monthly

ISSUE 369

AUGUST 1983

PS Magazine - AUGUST 1983 - Page 24 of 34
AN/VIC-1 intercom Set .±²
parts
of
your
system are scattered in, on± around
and through your tracked vehicles.
Your good
PM
is the glue that holds
'em all tOgether²
Here³Re a few tips and reminders
to help´ you get thE job doneµ
On the Outside
Control boxes mounted on the
outside of you¶ tRack aRen³t steps.
Keep your f·et or extra gear off¸
Hands oFf the
¹
cable that feeds the
boxesº
too² It³s not a handhold²
You³ll tear
up
insulation or
connectors by hoisting yourself up at
its expense²
That saMe cable goes through the
engine
compartMent
on
many
44
0
±
vehicles»
W
arn youR mechs to ¼eep
an eye on it when they reMove or
½
install the p¾wer pack²
ContRol box ¿andsets need your
attention² Always Replace 'eM in
theiR holders w¿en you³re throug¿
before slaMming t¿e coveRÀ The
metal
is
sharp
enoug¿ to cut
insuLation and KÁ youR coMmoµ
Keep diRt and moistuRe froM
contRol box innaRds by watching the
condition of the pRefoRmed packinG.
²5
no longer do its moisture-prooÂing
thinGµ
YouR org maintenance replaces
ad gaskets with these:
Control Box
Gasket NSN
C-2296, ³2298´
-
2299
µ33¶³¶¶³¶9µ-22µ6
C³2297
µ33¶·¶¶³884³2491
C³2742
µ33¶·¶¶³892³4111


Back to Top
Back to Top