MWO-5-2350-262-35-4

ARMORED COMBAT EARTHMOVER (ACE), M9

MODIFICATION WORK ORDER

  MWO-5-2350-262-35-4 - Page 18 of 207

MWO 5--2350--262--35--4
1--11
1--9
SPECIAL TOOLS; TOOL KITS; JIGS; TEST, MEASUREMENT, AND DIAGNOSTIC
EQUIPMENT (TMDE); AND FIXTURES REQUIRED. -- CONTINUED
Table 1--12. Test Equipment Required
Item No.
Quantity
Description
1
1
Hydraulic Pressure Test Stand -- 4000 psig (27579.03 kilopascal),
5 GPM (18927.06 CPM) Minimum capability
2
As Required
Hydraulic Hoses --4, --6, --8, --10 and --12 with 37
_
Flare Hose fittings
3
3
--4, 37
_
Flare nut cap
4
3
--6, 37
_
Flare nut cap
5
14
--8, 37
_
Flare nut cap
6
2
--10, 37
_
Flare nut cap
7
2
--12, 37
_
Flare nut cap
8
1
28 VDC Power Supply, minimum 4.0 amperes capacity
9
1
Multimeter
10
1
15 VDC Power Supply, minimum 4.0 amperes capacity
11
3
Pressure Transducer Test cables with Amp 1.5 Super Seal Connector
(5 conductor)
12
4
Solenoid Valve Test cables Amp 1.5 Super Seal Connector (2 conductor)
1--10 MODIFICATION PROCEDURES.
See applicable chapter for modification procedures.
1--11 CALIBRATION REQUIREMENTS.
Not applicable.
1--12 WEIGHT AND BALANCE DATA.
Weight and balance are not significantly affected.
1--13 QUALITY ASSURANCE REQUIREMENTS.
a.
General. Quality assurance will be accomplished in accordance with TM 750--245--4.
b.
Physical Inspection. Check components that are removed or installed during the modification for stability
of mounting.
c.
Functional Inspection. Start vehicle and ensure that the hydraulic system is operating properly and that
all controls and indicators/gauges associated with the hydraulic system properly control their specified
hydraulic functions and indicate the correct hydraulic fluid pressures and temperatures in accordance
with TM 5--2350--262--10.


Back to Top