TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 133 of 460

TB 9-2320-279-13&P-2
ESCAPE HATCH ASSEMBLY MAINTENANCE - CONTINUED
0023 00
0023 00-3
DISASSEMBLY - CONTINUED
3.
Remove eight locknuts (9), washers (10), bolts (13), washers (14), and four escape hatch brackets (11) from roof.
Discard locknuts.
4.
Remove four bolts (16), washers (15), and keeper pins (12) from four escape hatch brackets (11).
CLEANING AND INSPECTION
Clean and inspect all parts IAW
General Maintenance Instructions
(WP 0011 00).
ASSEMBLY
CAUTION
Do not overtighten draw latch component mounting hardware, or damage to draw latch components may result.
1.
Install four keeper pins (12) on four escape hatch brackets (11) with four washers (15) and bolts (16). Tighten bolts to 36
lb-in. (4 Nm).
2.
Install four escape hatch brackets (11) to roof with eight washers (14), bolts (13), washers (10), and new locknuts (9).
417-018
9
10
11
12
13
14
15
16


Back to Top