TB-9-2320-302-13-P-1

CREW PROTECTION KIT PART 1 OF 3

TECHNICAL BULLETIN; OPERATOR’S, UNIT AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS

NOVEMBER 2006

  TB-9-2320-302-13-P-1 - Page 313 of 380

Installation Manual – P/N 0257550622-00
(Doc No.:
II
113500-1 D)
Freightliner M915 / M916 -
Crew Protection Kit
Page 121 of 125
7.6 Shift Tower Installation (M916-A1 Only)
This procedure may be performed anytime after Step 5.4 in the installation process.
7.6.1 Parts, Fasteners, Special Tools, and Materials
Parts
(see Figure 7-11):
Part No.
Alternate
Part No.
Description
Find No. in
Procedure
Quantity
113509-1
Adapter, Shift Tower
#509
1
Fasteners
: (see Figure 7-11)
Find No.
(Table 3-5)
Description
Size
Quantity
4
Bolt (these bolts were temporarily used in step 5)
5/16” x 1-1/4”
5
25
Flat Washer
5/16”
5
56
Screw, Button Head Cap
1/4” x 1/2”
8
32
Flat Washer
1/4”
8
Special Tools
:
Description
Vendor/Part-Number
8.6.2 Installation Instructions
1.
Bolt the shift tower adapter #509 to the Center Floor Armor # 815.
2.
Feed the shifter cable up through the modified square hole in the center floor panel and
the adapter plate.
Re-attach the shift cable to the shift tower and bolt the shift tower to the
shift tower adapter part #509 (see Figure 7-11).
Apply thread-locking compound to the
screws.
3.
Feed the transfer case cable up through the hole cut in the center floor panel #815 and
adapter plate #509.
Re-attach the transfer case cable to the transfer case shifter and
fasten the shifter (not shown) to the adapter plate part #509 using the four holes indicated
in Figure 7-11 and four more Screws 56 and Flat washers 32.
Apply thread-locking
compound to the screws.


Back to Top