TB 9-2320-302-13&P-1
0017 00-1
CAB SUPPORT REINFORCEMENT REPLACEMENT
0017 00
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Maintenance Level
Unit
Tools and Special Tools
Tool Kit, General Mechanic’s (Item 8, WP 0033 00)
Shop Equipment, Common No. 1 (Item 6, WP 0033
00)
Device, Lifting (4,000-lb capacity)
Materials/Parts
Rag, Wiping (Item 6, WP 0034 00)
References
WP 0011 00
Personnel Required
Two
Equipment Conditions
(M915A3P1, M916A3P1, and M917A2P1)
Vehicle parked on level ground (TM 9-2320-302-
10)
Parking/Emergency Brake applied (TM 9-2320-
302-10)
Engine off (TM 9-2320-302-10)
Battery Disconnect Switch in OFF position (TM 9-
2320-302-10)
Equipment air pressure relieved (TM 9-2320-302-
10)
Equipment Conditions - Continued
(M915A4P1)
Vehicle parked on level ground (TM 9-2320-303-
10)
Parking/Emergency Brake applied (TM 9-2320-
303-10)
Engine off (TM 9-2320-303-10)
Battery Disconnect Switch in OFF position (TM 9-
2320-303-10)
Equipment air pressure relieved (TM 9-2320-303-
10)
(M915A2P1, M916A1P1, M916A2P1, and
M917A1P1)
Vehicle parked on level ground (TM 9-2320-363-
10)
Parking/Emergency Brake applied (TM 9-2320-
363-10)
Engine off (TM 9-2320-363-10)
If equipped, Battery Disconnect Switch in OFF
position (TM 9-2320-363-10), otherwise, discon-
nect battery cables (TM 9-2320-363-20-2)
Equipment air pressure relieved (TM 9-2320-363-
10)