TB-9-2350-277-40-P-2

CARRIER, PERSONNEL, FULL TRACKED, ARMORED M113A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 2 OF 4

JUNE 2009

  TB-9-2350-277-40-P-2 - Page 26 of 100

TB 9-2350-277-40&P-2
REMOVAL PROCEDURES – Continued
0003 00
0003 00-2
REMOVE ENGINE BULKHEAD HARDWARE OR COMMANDER’S INTERCOM UNIT
NOTE
If the carrier has a commander’s intercom unit on the left side of the
engine bulkhead, do Step 1.
If carrier has a commander’s intercom
unit on the right side of the engine bulkhead, do Steps 2-3.
1.
Remove two screws (6), lockwashers (5), and self-locking nuts (4).
Discard hardware.
Figure 2.
Engine Bulkhead Hardware Removal


Back to Top