TB-9-2350-277-40-P-2

CARRIER, PERSONNEL, FULL TRACKED, ARMORED M113A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 2 OF 4

JUNE 2009

  TB-9-2350-277-40-P-2 - Page 30 of 100

TB 9-2350-277-40&P-2
REWORK PROCEDURES – Continued
0004 00
0004 00-2
ASSEMBLE POWER PLANT UPPER REAR ACCESS PANEL
1.
Install angle bracket (6) in its new orientation rotated 180° on power plant upper rear access
panel (3).
Secure with two screws (12), mounting plate (2) and two self-locking nuts (14).
2.
Install spring tension clip (5) on angle bracket (6). Secure with screw (13) and self-locking nut
(15).
3.
Install bracket assembly (17) on power plant upper rear access panel (3).
Secure with two
screws (12), mounting plate (2) and two self-locking nuts (14).
4.
Install bracket assembly (11) on bracket assembly (17).
Secure with two screws (18) and self-
locking nuts (16).
5.
Remove existing part number 12369630 and replace with 12498099 on power plant upper rear
access panel.
Figure 2.
Assemble Power Plant Upper Rear Access Panel
END OF WORK PACKAGE


Back to Top