TB-9-2350-277-40-P-2

CARRIER, PERSONNEL, FULL TRACKED, ARMORED M113A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 2 OF 4

JUNE 2009

  TB-9-2350-277-40-P-2 - Page 28 of 100

TB 9-2350-277-40&P-2
REMOVAL PROCEDURES – Continued
0003 00
0003 00-4
REMOVE SPALL LINER RIGHT ANGLE BRACKET HARDWARE
NOTE
If the carrier is a M113A3AMB ambulance, there will be no spall liners,
spall liner tracks, and right angle brackets.
Otherwise, do Step 1.
1.
Remove two screws (13) and flat washers (12) securing spall liner right angle bracket to sponson.
Discard screws and washers.
Figure 4.
Spall Liner Right Angle Bracket Hardware Removal
END OF WORK PACKAGE


Back to Top