TB-9-2350-277-40-P-2

CARRIER, PERSONNEL, FULL TRACKED, ARMORED M113A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 2 OF 4

JUNE 2009

  TB-9-2350-277-40-P-2 - Page 37 of 100

TB 9-2350-277-40&P-2
MODIFICATION PROCEDURES – Continued
0005 00
0005 00-7/8 blank
DRILL CREW II HULL ROOF CABLE CLAMP
NOTE
To protect hull integrity, do not break through hull when drilling.
Measure and mark drill for required depth listed in the following steps.
1.
Locate and mark for hole (12) on interior of hull roof, measuring from engine bulkhead (14) and
from inside of right side hull edge (13).
2.
Drill a hole using a 5/32 inch drill to a maximum depth of 3/4 inch.
DO NOT BREAK THRU.
3.
Tap hole using a 3/16 x 24 tap.
Tap hole to a minimum of 7/16 inch depth.
Figure 6.
Location for CREW II Hull Roof Cable Clamp
END OF WORK PACKAGE


Back to Top