TB-9-2350-277-40-P-2

CARRIER, PERSONNEL, FULL TRACKED, ARMORED M113A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 2 OF 4

JUNE 2009

  TB-9-2350-277-40-P-2 - Page 31 of 100

TB 9-2350-277-40&P-2
MODIFICATION PROCEDURES
0005 00
0005 00-1
THIS WORK PACKAGE COVERS:
Drill CREW II GPS Antenna Riser Cable Port (page 0005 00-1).
Drill CREW II Primary Unit Mounting Bracket (page 0005 00-4).
Clearance for CREW II Primary Unit (page 0005 00-5).
Drill CREW II Engine Bulkhead Cable Clamp (page 0005 00-6).
Drill CREW II Hull Roof Cable Clamp (page 0005 00-7).
INITIAL SETUP:
Maintenance Level
Sustainment
Tools and Special Tools
Cutoff Saw, Air Powered (WP 0012, Item 1)
Die and Tap Set, Thread Cutting (WP 0012 00, Item 2)
Drilling Machine, Upright (WP 0012 00, Item 3)
Drill Set, Twist (WP 0012 00, Item 4)
General Mechanic’s Tool Kit (WP 0012 00, Item 5)
Goggles, Industrial (WP 0012 00, Item 6)
Hole Saw Set, Carbide Tipped (WP 0012, Item 7)
Magnetic Drill Base Plate/Template (WP 0013 00)
Measuring Tape ( WP 0012 00, Item 8)
Portable Drill, Electric, 1/2 inch (WP 0012 00), Item 9)
Sander, Disk, Electric, Portable (WP 0012, Item 10)
Materials/Parts
CREW II Modification Kit (12498026)
Wheel, Cutoff (WP 0014 00, Item 3)
Personnel Required
Mechanic
References
TM 43-0139
Equipment Conditions
Carrier parked on level ground
Engine stopped (TM 9-2350-277-10)
Vehicle blocked (TM 9-2350-277-10)
DRILL CREW II GPS ANTENNA RISER CABLE PORT
WARNING
Flammable or explosive compounds can ignite and seriously injure or
kill personnel.
Remove and stow all flammable and explosive
materials from vehicle and surrounding area.
CAUTION
Remove all equipment and gear from right side sponson area and top
right side rear area to prevent damage when drilling holes in right side
wall and upper hull.


Back to Top