TB-9-2350-277-40-P-2

CARRIER, PERSONNEL, FULL TRACKED, ARMORED M113A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 2 OF 4

JUNE 2009

  TB-9-2350-277-40-P-2 - Page 39 of 100

TB 9-2350-277-40&P-2
INSTALLATION PROCEDURES
0006 00
0006 00-1
THIS WORK PACKAGE COVERS:
Install GPS Kit (page 0006 00-1).
Install GPS Antenna Riser (page 0006 00-8).
Install Power Plant Upper Rear Access Panel (page 0006 00-9).
Install RCU/PDA Bracket Assembly (page 0006 00-10).
Install RCU/PDA Cable Clamps and Commander’s Intercom Unit (page 0006 00-11).
Install Primary Unit Bracket Assembly (page 0006 00-13).
Install GPS Antenna Cable Clamps and Power Harness Clamps (page 0006 00-14).
Install GPS Antenna Cables (page 0006 00-15).
Install Power Harness, RCU Cable, RCU to PDA Cable, and GPS Cable (page 0006 00-16).
INITIAL SETUP:
Maintenance Level
Sustainment
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0012 00, Item 5)
Torque Wrench (WP 0012, Item 11)
Materials/Parts
Cleaning Compound (WP 0014 00, Item 1)
Crew II Modification Kit (12498026)
Personnel Required
Mechanic
Equipment Conditions
Carrier parked on level ground
Engine stopped (TM 9-2350-277-10)
Vehicle blocked (TM 9-2350-277-10)
INSTALL GPS KIT
NOTE
If the carrier has a SINCGARS antenna mounted, do Steps 1-2.
If
carrier has no antenna, go to Step 3.


Back to Top