TB-9-2350-277-40-P-2

CARRIER, PERSONNEL, FULL TRACKED, ARMORED M113A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 2 OF 4

JUNE 2009

  TB-9-2350-277-40-P-2 - Page 29 of 100

TB 9-2350-277-40&P-2
REWORK PROCEDURES
0004 00
0004 00-1
THIS WORK PACKAGE COVERS:
Disassemble Power Plant Upper Rear Access Panel (page 0004 00-1).
Assemble Power Plant Upper Rear Access Panel (page 0004 00-2).
INITIAL SETUP:
Maintenance Level
Sustainment
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0012 00, Item 5)
Materials/Parts
Crew II Modification Kit (12498026)
Personnel Required
Mechanic
Equipment Conditions
Power plant upper rear access panel
removed (WP 0003 00)
DISASSEMBLE POWER PLANT UPPER REAR ACCESS PANEL
1.
Remove screw (4), self-locking nut (8), and spring tension clip (5) from angle bracket (6).
Discard
screw and nut.
Retain spring tension clip for reassembly.
2.
Remove two screws (10), self-locking nuts (9), and bracket assembly (11) from angle bracket (6).
Discard screws and nuts.
Retain bracket assembly for reassembly.
3.
Remove four screws (1), self-locking nuts (7), two mounting plates (2), and angle brackets (6)
from power plant upper rear access panel (3).
Discard screws, nuts, and one angle bracket.
Retain mounting plates and one angle bracket for reassembly.
Figure 1.
Disassemble Power Plant Upper Rear Access Panel


Back to Top