TB-9-2350-277-40-P-2

CARRIER, PERSONNEL, FULL TRACKED, ARMORED M113A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 2 OF 4

JUNE 2009

  TB-9-2350-277-40-P-2 - Page 52 of 100

TB 9-2350-277-40&P-2
INSTALLATION PROCEDURES – Continued
0006 00
0006 00-14
INSTALL GPS ANTENNA CABLE CLAMPS AND POWER HARNESS CLAMPS
NOTE
Do not tighten cable clamps until establishing the cable lengths
necessary to attach to their connecting components.
1.
Install clamp (54) to right side hull.
Secure with screw (47) and lockwasher (53).
2.
Install clamp (40) to right side hull.
Secure with screw (47) and lockwasher (53).
3.
Install two clamps (55) to right side of hull.
Secure with two screws (44) and lockwashers (43).
Figure 13.
GPS Antenna Cable Clamps and Power Harness Clamps Installation


Back to Top