TB-9-2350-277-40-P-2

CARRIER, PERSONNEL, FULL TRACKED, ARMORED M113A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 2 OF 4

JUNE 2009

  TB-9-2350-277-40-P-2 - Page 50 of 100

TB 9-2350-277-40&P-2
INSTALLATION PROCEDURES – Continued
0006 00
0006 00-12
NOTE
Do not tighten cable clamps until establishing the cable lengths
necessary to attach to their connecting components.
3.
Install clamp (40) to RCU/PDA bracket assembly.
Secure with screw (46) and self-locking nut
(37).
4.
Install clamp (40) to RCU/PDA bracket assembly.
Secure with screw (47) and self-locking nut
(37).
5.
Install clamp (42) to engine bulkhead.
Secure with screw (45) and self-locking nut (41).
6.
Install clamp (42) to interior of hull roof.
Secure with screw (44) and lockwasher (43).
Figure 11.
RCU/PDA Cable Clamps Installation