TB 9-2350-277-40&P-3
INSTALLATION PROCEDURES – Continued
0005 00
0005 00-11/12 blank
INSTALL POWER HARNESS, RCU CABLE, AND RCU TO PDA CABLE
NOTE
Do not secure cables with tie straps until installation is complete and
the cables have been adjusted at both ends.
1.
Route power harness (50) from radio/electrical connection (48) and through clamp (43) up to PDA
cradle and RCU location.
2.
Continue routing power harness (50) from radio/electrical connection (48) to primary unit location.
3.
Route RCU cable (51) from primary unit location through two clamps (43) up to PDA cradle and
RCU location.
4.
Remove screw (52) and lockwasher (53) securing existing loop clamp and wiring harness to
turbine housing wall.
Retain hardware for re-installation.
5.
Install power harness ground lead (54) over existing loop clamp and wiring harness.
Secure with
screw (52) and lockwasher (53).
6.
Secure all loose power harness, RCU cable, and RCU to PDA cable (49) connections to their
appropriate bracket assembly with tie straps.
Figure 10.
Power Harness, RCU Cable, and RCU to PDA Cable Installation
END OF WORK PACKAGE