TB 9-2510-251-24
1-41
5)
Install B-partition center bracket as follows (see figure 1-20).
a.
Position B-partition center bracket (3) aligning with bottom holes of lower B-partition gap strip and
transfer two hole locations to vehicle tunnel as shown in figure 1-20.
b.
Drill two 13/32-inch holes into vehicle tunnel and install two upset fasteners (2).
c.
Apply fasting compound to two capscrews (7).
d.
Install B-partition center bracket (3) onto vehicle tunnel securing with two capscrews (7) and washers (6).
Torque two capscrews (7) to 23 lb ft (31 N
•
m).
e.
Secure B-partition center bracket (3) onto lower B-partition gap strip with two capscrews (1), washers (4)
and locking nuts (5).
Torque two capscrews (1) to 37 lb ft (50 N
•
m).
1
VEHICLE
TUNNEL
(REF)
TRANSFER TWO
HOLE LOCATIONS
LOWER
B-PARTITION
GAP STRIP
(REF)
LEFT
B-PARTITION
ASSEMBLY
(REF)
RIGHT
B-PARTITION
ASSEMBLY
(REF)
2
3
4
5
6
7
Figure 1-20.
B-Partition Center Mount Bracket Installation (2 Door Only)